Sopoco Completes 1.145 MWh Battery Storage System at AJW Group HQ


Sopoco delivered a 1.145 MWh commercial battery storage system at AJW Group’s global headquarters in Slinfold, West Sussex.

The installation combines five Sungrow PowerStack battery cabinets with Atmosphere EMS and integrates with the site’s existing rooftop solar PV and inverter infrastructure. Alternergy supported the project with system design, capacity modelling, product supply, logistics coordination and technical guidance.

 

Case Study

Sopoco Completes 1.145 MWh Battery Storage System at AJW Group HQ


Sopoco delivered a 1.145 MWh commercial battery storage system at AJW Group’s global headquarters in Slinfold, West Sussex. 

Project facts



Installer

Sopoco



Client

AJW Group



Location

Slinfold, West Sussex



Project type

Commercial battery storage



Storage capacity

1.145 MWh



Combined rated AC output

550 kW



Battery system

5 × Sungrow PowerStack ST225kWh-110kW-2h battery cabinets



Energy management

Atmosphere EMS



Design platform

Orkestra



Existing solar PV

Approximately 800 kW rooftop system



Alternergy support

System design, capacity modelling, product supply, logistics and technical guidance



Completion

Mid 2026

Project facts


Installer

Sopoco


Client

AJW Group


Location

Slinfold, West Sussex


Storage capacity

1.145 MWh


Combined rated AC output

550 kW


Battery system

5 × Sungrow PowerStack ST225kWh-110kW-2h battery cabinets


Project Overview

AJW Group’s global headquarters in Slinfold, West Sussex, already had an approximately 800 kW rooftop solar PV system in operation.

Although the solar installation was generating effectively, part of the electricity produced on-site was being exported to the grid for a limited financial return. Outside solar-generation hours, the facility was also drawing significant electricity from the grid.

AJW Group therefore, required a storage solution that could retain more of its solar generation on site, improve self-consumption and help reduce its overall electricity costs.


Energy Data Analysis and System Sizing

To establish the appropriate battery capacity, Sopoco worked with Alternergy and Orkestra to analyse AJW Group’s half-hourly electricity-consumption data and existing solar-generation data.

The information supplied by the client was modelled through the Orkestra design platform to assess expected system performance, examine potential return on investment and produce an evidence-based recommendation for the required storage capacity.


Battery Storage System Design

To improve on-site energy resilience and maximise the use of AJW Group’s existing solar generation, Sopoco installed a 1.145 MWh commercial battery storage system.

The completed system consists of



Project Overview

AJW Group’s global headquarters in Slinfold, West Sussex, already had an approximately 800 kW rooftop solar PV system in operation.

Sopoco installed a 1.145 MWh battery system combining five Sungrow PowerStack cabinets with Atmosphere EMS, integrating with the existing solar PV and inverter infrastructure.

The system helps reduce grid consumption, improve onsite energy use and support the site's long-term sustainability goals.


Battery Storage System Design



Installation and Commissioning

This was Sopoco’s largest cabinet-style battery storage installation at the time of the project and its first project at this level of scale.

Despite the size and complexity of the system, the installation was completed successfully and without significant issues.

The project involved coordination between Sopoco, Alternergy, Sungrow, Atmosphere and Orkes
tra, with each partner providing specialist support across system design, product supply, installation, energy management and commissioning.


" Thanks to Russ and the Sopoco team, the whole install went perfectly. "



Installation and project support

This was Sopoco’s largest cabinet-style battery storage installation at the time of the project and its first project at this level of scale.

Despite the size and complexity of the system, the installation was completed successfully and without significant issues.

The project involved coordination between Sopoco, Alternergy, Sungrow, Atmosphere and Orkestra, with each partner providing specialist support across system design, product supply, installation, energy management and commissioning.


" Alternergy were on hand at every stage, from planning to commissioning, ensuring Sopoco had everything they needed to deliver with confidence." -  Sopoco Project Team

01

Sungrow PowerStack Battery Storage

Five PowerStack cabinets provide a combined nominal capacity of 1.145 MWh and rated AC output of 550 kW.

02

Atmosphere Energy Management System

Atmosphere EMS provides the site-wide energy-management layer for the battery, solar PV and electrical infrastructure.

03

Integration with Existing Solar PV

The battery system allows more of the electricity generated during daylight hours to be retained and used on site.




Products and Technologies Used 

Principal technologies supporting the battery installation and site-energy strategy.

Sungrow PowerStack

Liquid-cooled commercial battery system

View product →

Atmosphere EMS

Energy-management technology supporting coordinated operation across the site.

Learn more →

Orkestra Design Platform

Used to analyse site data and support evidence-based system-capacity selection.

Learn more →


Installation Images

Sopoco’s Cabinet-style Commercial Battery Installation (duration 5:08)

Project Video

- A closer look at the battery system, installation and project partners.

Project Team


Planning

David Cracknell, Sopoco


Lead installer

Russ Brown, Sopoco


Installation team

Jess and Jimmy, Sopoco


Commissioning support

Sungrow


Orkestra design and modelling

Juan Ruiz and Mark Gardiner


Energy-management system setup

Atmosphere


Design and backend support

Laura Piscitelli, Alternergy


Alternergy’s Role

Alternergy worked alongside Sopoco from the early planning stage through to final commissioning.

System design and capacity modelling 

Analysis of project requirements 

Product supply and logistics coordination 

Technical guidance throughout 

Organising On-the-ground commissioning support 

Alternergy handled a lot of the backend complexity of the project including multi-partner coordination. 



" Alternergy were on hand at every stage, from planning to commissioning, ensuring Sopoco had everything they needed to deliver with confidence."  -   Sopoco Project Team 

Project Significance What This Means for Sopoco 

The completed installation demonstrates Sopoco’s ability to deliver complex commercial and industrial battery storage projects at significant scale.

It also gives the installer experience that can support future cabinet-based storage and commercial solar-and-storage projects.

Sungrow PowerStack Battery Cabinets

Five PowerStack ST225kWh cabinets providing 1.145MWh of storage capacity 

Completed Installation

The completed battery storage system at AJW Group HQ


















Project Team

The project team from Sopoco and our technology partners

Installation Team

Sopoco instalaltion team on site during the project



Installation Images


Sopoco

Sopoco plans and delivers solar PV and battery storage installations for commercial and industrial customers.

The AJW Group installation demonstrates the company’s capability to coordinate a complex commercial storage system involving several specialist technology partners.

Visit Sopoco→



Alternergy

Alternergy is a trade-only solar distributor supplying solar panels, inverters, battery storage, mounting systems and EV charging equipment to UK installers. 
 We support residential and commercial projects with product selection, technical guidance and UK-wide delivery. 

 About Alternergy→




Sopoco

Sopoco plans and delivers solar PV and battery storage installations for commercial and industrial customers.

Visit Sopoco→


Alternergy

Alternergy is a trade-only solar distributor supplying solar panels, inverters, battery storage, mounting systems and EV charging equipment to UK installers.  

 About Alternergy→